B · Normal
September 23rd, India’s initial manufacturing PMI value in September was 55.7, which was expected to be 53 and the previous value was 52.8. The preliminary value of India's services PMI in September was 55.8, which was expected to be 54.4 and the previous value was 54.1.
Comments