On the evening of December 14, the Beijing Metro officially released news: Currently, the upstream contact track from Xierqi to the Life Science Park section of the Changping Line (bound to Changping Xishankou) has no power. Some trains have been temporarily stopped and some trains have been delayed. We apologize for the inconvenience this has caused to you.
Continuing report: At present, the section from Zhuxinzhuang Station to Changping Xishankou Station on the Changping Line is still operating. Passengers in urgent need please detour to other lines or use other means of transportation.
The staff are currently actively organizing rescue operations, so passengers are asked to wait patiently.
It is preliminary understood that the Changping Line is experiencing vehicle failure. Staff are organizing emergency rescue and evacuation. Passengers on site are requested to cooperate with staff guidance and pay attention to safety.
According to many netizens at the scene, some passengers on the train were injured and unconscious.
According to pictures taken by netizens at the scene, the connection between the carriages of the Changping Line accident train broke.
Officials have not yet announced the specific circumstances of the accident.
Public information shows that the Beijing Subway Changping Line (Beijing Subway Changping Line), also known as "Beijing Subway Line 27", is the tenth completed and operational subway line in Beijing, China. The first phase (Xierqi Station to Nanshao Station) was opened on December 30, 2010. ), the second phase (Nanshao Station to Changping Xishankou Station) was opened on December 26, 2015, the northern section of the first phase of the south extension (Xierqi Station to Qinghe Station) was opened on December 31, 2021, and the southern section of the first phase of the south extension (Qinghe Station to Xitucheng Station) was opened on February 4, 2023. The logo color is pink. As of February 2023, the Beijing Metro Changping Line starts from Changping Xishankou Station in the north and ends at Xitucheng Station in the south, passing through Changping District and Haidian District. As of February 2023, the Beijing Metro Changping Line has a total length of 43.1 kilometers and a total of 18 stations, including 6 elevated stations and 12 underground stations; it has a depot at the Ming Tombs Scenic Area and a parking lot at Dingsi Road; it uses 6-car B-type trains. (Text | Lin Yurun, China Infrastructure Newspaper)