B · Normal
[The concept of semiconductors fluctuated and surged, and Torrance rose by more than 11%] On September 24th, the concept of semiconductors fluctuated and surged, and Torrance rose by more than 11%. Zhichun Technology, Shengmei Shanghai, Fuled, and Huafeng Measurement and Control followed suit. On the news, it is reported that the delivery cycle of core components required for South Korean semiconductor manufacturing equipment has generally more than doubled, and the waiting time for some key components made in Japan is even as long as 40 months.
Comments