Changxin has advanced long-term supply agreements with many first-line customers. The pace of 4F2 mass production depends on client verification.

📅 2026-11-18

Abstract:

At Changxin Technology’s 2026 third quarter performance briefing held on November 17, President Cao Kanyu disclosed the latest progress in customer cooperation and the next-generation 4F² DRAM architecture.

Facing the structural growth of storage brought about by AI, the company is locking in medium and long-term orders through long-term supply agreements. The large-scale mass production time of the new generation technology does not have a fixed node and will be advanced according to the progress of customer verification.

Cao Kanyu said,

At present, the company has negotiated with a number of first-line leading customers to promote LTA (long-term supply agreement).

In the global storage industry, Changxin has become the mainstream cooperation model to cope with the growth of AI-driven demand. With the help of long-term supply agreements, it can lock in mid- to long-term deterministic orders, reduce operating risks caused by industry cycle fluctuations, and help Changxin grow into a core memory supplier in the AI ​​era.

Technically,

the sixth-generation DRAM platform based on the 4F² architecture has completed engineering sample verification.

The architecture adopts a bonding and stacking scheme of logic wafers and memory wafers, coupled with self-developed VSG vertical surround gate transistors, opening up space for subsequent process shrinkage.

It is reported that the product launch sequence will give priority to high value-added and high storage density scenarios such as servers, and then expand to other consumer product lines.

Regarding the mass production time of the 4F² architecture that the market is concerned about, Changxin did not give a clear timetable. Cao Kanyu emphasized that the mass production timing will be comprehensively judged based on internal testing of samples, customer verification progress, and actual market demand.

Large-scale mass production will only begin after complete client certification is completed.

Avoid risks caused by hasty launch of technology products.

In terms of the industry environment, Changxin predicts that the DRAM supply shortage will continue in the fourth quarter. The construction of server-side AI computing power continues to drive DRAM consumption, and end-side AI terminals also bring incremental space.

Changxin also mentioned that the mass production of advanced platforms can significantly increase the output of single wafers. With the addition of production capacity construction and the improvement of production capacity utilization, the scale effect of enterprises will continue to be released.

On the basis of self-research,

Changxin will also collaborate with domestic equipment and material manufacturers on research and development to promote the common upgrading and development of the entire domestic DRAM industry chain.


Related tags

Related articles

Comments

0/500
Captcha (click to refresh)
No comments yet